Frac Sand Dewatering System

Patent Pending # 15/850,203

December 21, 2017

WIP-DRAIN is a passive draining structural floor system now draining frac sand in 12-15 hours with moisture reduction readings of 3.75- 4.2 %. No longer does industry accepted levels of 8-10% moisture need to be acceptable!

What does each 1% in moisture cost you?